Monday, October 9th, 2006


I’m running my NSLU2 as a file server, torrent client and kaid server. With 6 torrents running, it runs out of memory, and starts killing processes willy-nilly.

Took me a while to figure out this was why my script to auto-start a new torrent was being “Terminated.”

Not sure how it works out which processes to kill, or if there’s a way to reduce memory use.

Then I came across a HOWTO: Add Additional Swap Space. Should fix stuff a bit.

Just a note: it takes ages for the file to be created, apparently.

Kissing A FoolGeorge MichaelLadies & Gentlemen : The Best Of George Michael ★★

Edit: using ps x o %mem 0 command, I can see that each enhanced-ctorrent process grabs about 5 meg, while the 10 or so kaid processes each use up 2.1Mb. Since I haven’t started using kaid yet, maybe I should stop it auto-starting…

View Comments (2)   RSS Feed for Comments on this Post

I’m in school holidays at the moment, and I’ve been rather busy doings some more of my house renovations.  The floors are all oiled, and just awaiting the oil to harden before it’s possible to put furniture on them.  They look great, Jaq did a really good job doing the oiling.

I also bought a heap of timber for the architraves and skirting boards - 90×12 meranti.  This is thinner than normal skirting boards, which tend to be 19mm.  Before I started putting them in, I had a bit of wiring to drop.  Because we are having an island computer and work bench, all of the cables need to come up through a trapdoor in the floor.  There was already a power point installed there, but I needed to pull some ethernet, phone and USB cables through a conduit.  These then needed to be terminated at either end with sockets, which has all been done.

With the cabling done, including dropping cable from the ceiling for the telephone connections, I was able to start on the skirtings and architraves.  I began by cutting some skirtings for the front corner of the lounge, where there were some fiddly bits that needed to be cut, before I discovered that I am much better off doing all of the architraves first, and then measuring the skirtings to fit.

Thus, the major part of today was spend cutting, sanding and priming the upright portions of the architraves for almost all of the doorways in the house.  Excluding internal doorways on rooms that haven’t been sanded, or finished yet.  I’ve been using an airless spray-gun, and have had fantastic results.

Tomorrow I plan to finish painting these, and put them up.  Measuring and cutting the top sections of these will be much easier with the uprights in position.  Then it will be skirting time again!

Anybody’s WarIcehouseMan of Colours ★★½

View Comment (1)   RSS Feed for Comments on this Post